Pre-Fabricated Post

 

  • Fungsi Gigi

    • Mastikasi
    • Fonetik
    • Kinetik
  • Restorasi Pasca PSA

    • Indirect
  • Post/ Pasak

    Rigid restorative material placed in the root of a non vital tooth

  • Core/ Inti

    Restorative material placed in the coronal area of the tooth

  • Crown

    Coronal restoration

    https://s3-us-west-2.amazonaws.com/secure.notion-static.com/38bc8c5b-16bf-4754-a664-f426ca1b6b92/Untitled.png

Post

  • Custom

    • Prefabricated Post
    • Fabricated Post
  • Material Post

    • Metallic Post
    • Non Metalling Post
  • Design

    • Smooth
    • Serrated-
    • Tapered Post
    • Parallel Post

    https://s3-us-west-2.amazonaws.com/secure.notion-static.com/3b151750-7091-45ab-ad11-79afaa0a40ba/Untitled.png

  • Surface Configuration (Pasak)

    • Smooth
    • Serated
    • Threated → ulir→ semakin mengunci
    • Tappered
    • Parallel
    • Retensi mekanis

    https://s3-us-west-2.amazonaws.com/secure.notion-static.com/737588e5-3a7e-46b3-8574-10c2744e8aad/Untitled.png

  • Faktor Pertimbangan Perencanaan

    • Retensi
    • Resistensi
    • Ferrule Effect
    • Kegagalan
    • Retrievability
  • Material of post

    • Metallic Post
    • NON Metallic Post

    https://s3-us-west-2.amazonaws.com/secure.notion-static.com/5b4f7181-ab3f-471b-a463-7ba3f7d33683/Untitled.png

  • Material of Core Built Up

    • Amalgam
    • Composite
    • Ceramics → mahal
    • Cements
  • Factor which Effect the Post Selection

    • Length
    • Shape
    • Diameter
    • Surface Configuration
    • Material
    • Lutting agent

Clinical Techniques

  • Structural and Biomechanical

    • Structural changes in dentin
    • loss of tooth structure
    • biomechanical factors
    • requirement for an adequate restoration
  • Restoration timing

    kapan layak dilakukan

    klo ada abses senggaknya diameternya tetap karena 1-2 minggu itu belum hilang

  • Restoration design

    • Principal and concepts
    • Planning the definitive restoration
  • Preparation of canal space and tooth

    • Coronal tooth preparation
    • post space preparation
  • Retention and core system

    • Anterior teeth
    • Posterior teeth
  • Clinical Procedure For Metal Post

    • Post selection
    • removal of gutta percha
    • finishing the post space
    • Try in pasak
    • Cementing Pasak
    • Pembuatan core/ Inti Pasak
  • Case

    • fracture
    • Perforation

    https://s3-us-west-2.amazonaws.com/secure.notion-static.com/e1fc89e1-91e7-455f-9e8b-a3615e0baacd/Untitled.png

Tidak ada komentar:

Diberdayakan oleh Blogger.